You’ve learned that you need to go through asbestos mitigation in Torrance. Of course, this is something that can take over your life, and in some cases, you need to move out to let the team do their work safely. With this in mind, it’s essential to know how long it will take.
The exact time is going to depend on the project, and the team you have working on your home will help determine that based on their knowledge. Here’s a rough guide based on previous projects.
Single Rooms Can Take a Day
If you just need to do the work on one room, then you could find that asbestos mitigation in Torrance only takes a day or so. The work can be completed quickly and without much risk to the whole family, as everything will be contained to that one space.
There are some factors that will lead to it taking a bit longer, or it can feel like it’s taking longer because of the prep work. You’ll need to move the furniture out of the room, and some projects can end up being bigger once the work starts.
If there are more rooms to get through, then the project is going to take longer. In cases of a whole house, it can take months to fully complete.
Ceiling Tiles Take Less Time Than Walls
The location of the asbestos will also affect the timeline. If the asbestos is only in the ceiling tiles, it’s going to take much less time to remove than if the crew needs to get into the walls or roof. The more extensive the project becomes, naturally, the longer it starts to take.
This is something that can become a much bigger project, though. While it may initially seem like the asbestos mitigation in Torrance is only for the ceiling tiles, there may be something spotted behind them. This can turn a one-day project into a several-week project.
Attics and Basements Can Extend the Project Timeline
When it comes to the removal of asbestos, the most important thing is to make sure it’s done safely. This isn’t just for the crew working on the project, but also for you afterward. Once the asbestos is disrupted, it can move around the house and you wouldn’t even know, so time to do it safely is important.
Harder to reach places, such as the attic and basement, can lead to the asbestos mitigation in Torrance taking longer than initially thought of. This is when projects can start to lead into the months, as the team may need to pivot into the original plan of attack.
After the mitigation, there is a need to run an air clearance test. This is done by a third party, which can lead to extending the time a little bit, as the crew will need to work with the third party.
Asbestos mitigation in Torrance is a necessary part of home repairs and renovations. Yes, it can take weeks or months depending on the size of project, but it’s worth it to make the home safe.